Raised Access Floor Installation: Best Practices

Subfloor preparation, pedestal grid layout, stringer vs stringer-less systems and cutting panels — installation best practices from our technical team.

A raised floor performs only as well as it is installed. Key best practices:

1. Subfloor preparation. Level, clean and moisture-sealed concrete. Mark the grid lines before placing pedestals.

2. Pedestal layout. Typical grid 500 × 500 or 600 × 600 mm, matched to the panel. Glue or mechanically fix pedestals; verify height with a laser level at every fourth pedestal.

3. Stringer or stringer-less. Stringer systems (OA600 C4, C8) add lateral stability and plenum air tightness for high-load or underfloor-air areas. Stringer-less systems (OA600 C3) reduce cost and allow single-panel access in light-duty rooms.

4. Panel cutting. Always cut from the perimeter inward; seal the cut edges of calcium sulphate panels with the manufacturer's edge sealant.

5. Covering alignment. Keep HPL and carpet patterns running consistently; leave ventilation panels reachable for damper adjustment.

PARETE provides full CAD installation details and can station technicians on your site worldwide.